Valves play a vital role in modern production and daily life, serving everything from mild operating conditions to extreme industrial environments. Cryogenic valves are primarily used in applications such as ethylene plants, liquefied natural gas (LNG) facilities, natural gas/LPG/LNG storage tanks and receiving terminals, air separation units, and petrochemical tail-gas separation equipment.
However, cryogenic media—such as ethylene, liquid oxygen, liquid hydrogen, LNG, and liquefied petroleum products—are not only flammable and explosive but also prone to vaporization when heated, causing their volume to expand hundreds of times almost instantly. The use of cryogenic valves allows for effective temperature control, thereby preventing safety hazards like explosions and leaks.
Valve maintenance is of paramount importance regardless of the operating conditions. In cryogenic environments, maintenance is far more challenging than at ambient temperatures due to factors such as material embrittlement, freezing or clogging caused by the medium, and seal deformation. Even minor oversights can lead to media leakage, equipment damage, or serious safety accidents. Adhering to a scientific maintenance procedure is the fundamental prerequisite for ensuring the long-term, stable operation of valves in cryogenic service.
تحضيرات ما قبل الصيانة
The first step is the selection of maintenance tools. Standard carbon steel tools are prone to brittle fracture at temperatures below -20°C; therefore, they must be replaced with tools—such as wrenches and pry bars—made from low-temperature alloy steel. For gaskets, low-temperature resistant materials like PTFE (polytetrafluoroethylene) or spiral-wound metal gaskets should be prioritized to avoid the loss of sealing effectiveness caused by rubber gaskets hardening in the cold. Additionally, prepare industrial-grade antifreeze lubricants, anhydrous ethanol, and spare seals suitable for the specific operating conditions.
Secondly, strict energy isolation procedures must be followed before maintenance begins. Promptly close the isolation valves upstream and downstream of the target valve, and use the vent valve to drain any residual cryogenic medium from the valve cavity. Allow the valve body temperature to rise naturally to above 0°C before commencing disassembly. If the medium is flammable, explosive, or corrosive, the valve cavity must be purged and displaced with an inert gas, and safety checks must be successfully completed before work begins. Finally, and most importantly, personnel must wear cold-resistant workwear and anti-slip safety shoes, as well as gloves designed for low-temperature environments, to prevent frostbite from splashes of cryogenic media. Anti-slip warning signs must be placed in the work area, and any accumulated water or ice on the ground must be promptly cleared to prevent personnel from slipping.
الاحتياطات أثناء الصيانة
First, inspect the valve body exterior for cold-brittleness cracks or deformation, paying particular attention to stress concentration points such as welds and flange connections. If cracks are detected, perform non-destructive testing (NDT) immediately; if damage exceeds permissible limits, replace the valve body directly. After dismantling the valve plug and stem, check the surfaces for signs of cryogenic corrosion or wear. If the stem’s bending exceeds 0.1 mm/m, it must be straightened or replaced; if the damage depth on the valve plug’s sealing surface exceeds 0.5 mm, it requires regrinding or replacement.
All removed gaskets must be replaced. Before installation, apply a uniform layer of low-temperature-specific sealing grease to the sealing surfaces. Tighten flange bolts in stages using a diagonal pattern to ensure even load distribution and prevent leaks caused by uneven sealing pressure at low temperatures. Completely remove old packing from the stuffing box and install new packing ring by ring, staggering the joints of adjacent rings by at least 120°. When tightening the gland, leave a 1–2 mm margin to accommodate packing shrinkage or deformation at low temperatures.
After assembly, perform a no-load opening and closing test (cycling the valve 3–5 times) to confirm smooth operation without binding and ensure the valve reaches the correct open/closed positions. If facilities permit, conduct a leak test using compressed air; the valve passes if the pressure drop does not exceed 1% of the design value over a 30-minute holding period.
عملية ما بعد الصيانة
إذا لم يتم العثور على أي مشاكل بعد الصيانة، فقد يتم إرجاع الصمام إلى الخدمة. ومع ذلك، تجنب الاتصال المفاجئ بالوسائط المبردة عند إعادة تشغيل الصمام. بدلاً من ذلك، افتح الصمام المنبع قليلاً لإدخال كمية صغيرة من الوسط المبرد وقم بتبريد جسم الصمام مسبقًا لمدة 30 دقيقة على الأقل. بمجرد أن تقترب درجة حرارة جسم الصمام من درجة حرارة التشغيل، افتح الصمام بالكامل تدريجيًا لمنع تشقق الإجهاد الناتج عن التقلبات السريعة في درجات الحرارة. قم بتعيين موظفين متخصصين لإجراء عمليات التفتيش خلال 24 ساعة من التشغيل، مع التركيز على التحقق من عدم وجود تسربات في توصيلات الحافة وصناديق الحشو، والتحقق من التشغيل السليم للصمام. زيادة وتيرة التفتيش خلال فترات درجات الحرارة المنخفضة في فصل الشتاء؛ بالنسبة للصمامات التي تكون خارج الخدمة لفترات طويلة، قم بتصريف الوسائط الداخلية، وإذا لزم الأمر، قم بإدخال وسيلة تتبع الحرارة لمنع التجمد والانسداد.